On 31 December 2026 a transition period under Germany’s Heating Costs Ordinance (Heizkostenverordnung) runs out. In apartment blocks with central heating or hot water, landlords must by then retrofit or replace every older heat cost allocator and heat or hot-water meter that lacks a radio module (Section 5(3)). Tenants will see nothing different on 1 January, but they gain rights worth knowing.
Whether the deadline will hold everywhere is open. The metering firm Techem surveyed 400 private landlords online in September: 47 per cent have fully or largely finished, 17 per cent partly, 29 per cent have not started. Some 34 per cent expect to miss the deadline, and more than a quarter did not know the duty existed. That is the company’s own survey, not a representative picture of the market. The trade body Deumess has urged owners to plan early to avoid shortages of devices and technicians.
Which devices – and which flats – are affected?
The rule covers meters installed before 1 December 2021 that cannot be read remotely: allocators on radiators, older ones still with evaporation tubes, plus heat and hot-water meters. New devices have had to be remote-readable since December 2021. A display alone proves nothing; consumer magazine ÖKO-TEST points to an antenna symbol or the word “Funk” on the screen.
According to ÖKO-TEST, flats with their own gas boiler and houses with at most two flats, one of them occupied by the owner, are exempt. So is anyone who can show technical impossibility, disproportionate effort or undue hardship (Section 5(3), second sentence). In those cases there is no right to cut the bill either.
What can tenants do if the deadline is missed?
They may reduce their share of heating and hot-water costs by 3 per cent (Section 12(1)). On a €1,000 share that is €30. The same 3 per cent applies if the monthly consumption notice is missing, which is mandatory with remote-readable devices: last month’s use in kilowatt-hours, compared with the same month a year earlier and with an average user (Section 6a). If costs are not billed by consumption at all, the cut is 15 per cent. By the Berlin tenants’ association’s reckoning the rates can add up to 15 plus 3 plus 3 per cent.
The reduction is not automatic. The tenant has to declare it to the landlord, and merely pointing out missing devices is not enough, according to the association, which offers a template letter.
On timing, the guides differ. The Berliner Mieterverein ties the 3 per cent cases to billing periods from 1 January 2027, while a guide on gegen-hartz.de says the 2026 bill cannot be cut merely because the deadline has passed. Our reading: it will first be felt in the bill for 2027, which under the general rule in Section 556 of the Civil Code must arrive by the end of 2028. Whether the right to cut for missing monthly notices already applies today is assessed differently in the sources; if in doubt, ask a tenants’ association.
Who pays – and must you let the fitters in?
The landlord must measure consumption, and tenants must tolerate the installation. If the landlord buys the devices, the Berlin association reckons on a modernisation surcharge under Section 559 of the Civil Code of 8 per cent of the cost per year; its example is hot-water meters at roughly €25 to €40. If devices are rented or leased, the landlord must first tell tenants every cost, a majority can object within a month, and a notice in the stairwell does not count. Without proper notice the rental costs cannot be passed on (Federal Court of Justice, VIII ZR 326/10).
A caveat: those information sheets date from 2022 and do not deal with the new remote-reading duties. How the 2027 retrofit may be passed on is not settled in the sources. Anyone who receives a notice of costs or dates should have a tenants’ association check it before agreeing.
Sources: HeizkostenV § 5, HeizkostenV § 12, Berliner Mieterverein, Techem, ÖKO-TEST



