Fri, 20 Nov 2026 Kyiv 22:51Berlin 21:51London 20:51 UKR / DE / EN

Munich’s A99 shuts for 57 hours from tonight

From 8 pm the ring road between Süd and Ost is closed until Monday 5 am. If you are heading for the airport, the Messe or a match, plan ahead.

Munich’s A99 shuts for 57 hours from tonight
Illustrative photo: Oliver Schröder / Pexels

From 8 pm the ring road between Süd and Ost is closed until Monday 5 am. If you are heading for the airport, the Messe or a match, plan ahead.

At 8 pm tonight Munich gets a weekend without the A99: between the Autobahnkreuz München-Süd and München-Ost the ring road will be fully closed in both directions until Monday, 23 November, 5 am – 57 hours in all. According to Eurotransport, about 96,000 vehicles a day use this stretch.

From 6 pm, ADAC says, the on-ramps at Hohenbrunn and Ottobrunn towards Nuremberg and at Haar towards Salzburg are shut. The B304 itself stays open.

Why the bridge has to come down in one go

The reason is the demolition of the B304 bridge over the A99 at the Haar junction. Built in 1973, it was found to be badly damaged in a May 2025 inspection – corrosion and spalling concrete, according to a motoring magazine. About 38,000 vehicles cross it daily (ADAC). Traffic has used a temporary bridge since late August; the replacement is due by the end of 2028 and costs about €30 million, according to Autobahn GmbH Südbayern.

Tearing it down piecemeal with traffic running below, ADAC and dpa explain, could drop debris onto the carriageway. Hence a full closure, timed for a weekend the Autobahn GmbH counts among the quietest of the year.

Where will everyone go?

There is no good diversion. ADAC expects traffic to push through the city: the B471, B304, Mittlerer Ring, A94, A99 West and B15. To keep that from seizing up, lorry and diesel bans on the Mittlerer Ring are being suspended temporarily, except between the A9 and A96 junctions (ADAC, 19 November). In early November Eurotransport still reported the exemptions as undecided, so go by the later ADAC details. The airport, the Messe and the Allianz Arena – where Bayern play on Friday evening – may all be affected.

Long-distance freight is meant to detour widely: from Würzburg via the A7, A96 and the Arlberg tunnel to the Brenner, from Nuremberg via Passau. Reinhold Fisel, president of the Bavarian haulage association LBT, called the closure “a major intervention in day-to-day business”; extra costs “cannot currently be put at a reliable figure”. He still prefers a short full closure to a long partial one.

Our read: Friday evening and Monday morning are likely to be the worst, when weekend and commuter traffic meet on the alternatives – though nobody can predict it precisely. If you need the airport on Saturday or Sunday, take the S-Bahn (S1, S8) and leave a buffer. If you can skip the car, stay home or start early.

A note on sources: the Landkreis München page, as of August, still gives 21–22 November. We follow the 20–23 November window that ADAC and dpa both report.

Sources: ADAC, dpa/web.de, Eurotransport, Landkreis München, auto motor und sport

EuroPulse on Telegram: the key stories, briefly (in Ukrainian) →